Colin - Eco House - 32m2 

Living in a dream house

Fully built turnkey insulated modular house, 32 m² (3.5 m x 9.1 m) with fibre board and cellulose insulation, modern clay plaster finish (BER A energy rating). C24 timber frame construction with Scandinavian larch facade. Fire-resistant, eco-friendly and breathable home, designed for Irish weather.

1 bedroom   1 open-plan living and dining area   1 bathroom

Call me: 0899430976 for more info.

PS. This House could be yours in next 4 weeks!

 



€79000 inc. VAT

TurnKey included in a price:

  • Delivery
  • Fully fitted, insulated modular living in house
  • Size of the house: 3.5 x 9.1 m, height 3m, in total 32m2
  • Living area in total 27m2
  • Triple glazed windows and doors
  • Heat and sound insulation: 225mm in the floor, 200mm in the walls and 225 in the roof
  • Inner finish: finishing boards, clay plaster
  • EPDM Roof ( Extremely durable rubber roofing membrane )
  • Parquet flooring
  • Electrical installation - wiring, sockets, lights
  • Sewage
  • Fully fitted kitchen (including cooker hood, 2 ring electric hob, sink with tap, fridge)
  • Fully fitted bathroom (toilet, shower cabin, sink, water boiler)
  • Heat elements by your choice
  • Production time: 14 to 16 weeks

€97000 inc. VAT

Fully TurnKey included in a price:

  • Delivery
  • Fully fitted, insulated modular living in house
  • Size of the house: 3.5 x 9.1 m, height 3m, in total 32m2
  • Living area in total 27m2
  • Triple glazed windows and doors
  • Heat and sound insulation: 225mm in the floor, 200mm in the walls and 225 in the roof
  • Inner finish: finishing boards, clay plaster
  • EPDM Roof ( Extremely durable rubber roofing membrane )
  • Parquet flooring
  • Electrical installation - wiring, sockets, lights
  • Sewage
  • Fully fitted kitchen (including cooker hood, 2 ring electric hob, sink with tap, fridge)
  • Fully fitted bathroom (toilet, shower cabin, sink, water boiler)
  • Heat elements by your choice
  • Foundation, groundworks
  • Crane in
  • Connection to water system
  • Connection to Sewage
  • Electricity connection to Principal House
  • Production time: 14 to 16 weeks